Nationaal Archief

Opleverdatum:
2010
Architect:
Carel van Hest Architecten
Extra Info:
Opening 12 April 2010
The biggest challenge with this project was building the bunker. An aluminum framework was used to build 30 cm thick concrete walls. It took multiple setups, removals and re-setups of the aluminum framework to finally build the walls and finish the bunker. The total project was finished within 14 months.